They spent two evenings on Ma May going through our landlord list line by line. The atlas for Tay Ho named three roofs we had already written off; one of those still had a usable water-tank pad. I wish the first draft had flagged the military buffer sooner — we lost a week confirming it — but the bound plates were what the committee actually marked up.

Lan Phuong · Radio planning, northern operator · Network expansion planning study

The fibre feeder sketch along the southern canal showed a duct that our as-built still listed as empty. We opened it; it was full of a third party. That single plate saved a crew from starting a lateral in the wrong place.

Marcus Reed · Transmission contractor, visiting from Da Nang · Fibre feeder and backhaul route study

I am not a radio engineer. Their wall print for Hoan Kiem used street names we already use in notices, so I could sit with the operator without translating jargon. The drive-test excerpts were quieter than I expected; they did not try to turn the meeting into a slideshow.

Nguyen Thanh Ha · Municipal liaison, inner-district office · District coverage mapping

We sent them twelve compounds. They came back with photographs of a rectifier that our register still called a spare. The tone of the discrepancy list was dry, which I prefer. One compound they could not enter because the guard had no letter; that gap is written plainly, not hidden.

Do Minh Tuan · Asset register owner, tower company · Tower and cabinet asset review

Longer note: Tay Ho roofs, 2025

Colleagues talking around a meeting table

An operator asked us to rank candidate roofs west of West Lake before a summer capex round. The inventory listed eight addresses; two were restaurants whose exhaust ran through dinner service. We photographed the remaining pads, named a military buffer on day two, and bound plates the committee later marked in pencil. The delayed buffer confirmation sat in the letter as a calendar slip, which the radio lead still mentions when she sends new work.

Longer note: canal duct, southern Hanoi

A transmission contractor opened a duct our plate had flagged as occupied. The as-built had shown spare. The crew stood down before cutting a lateral that would have isolated a cluster. We added a dated photograph of the occupied duct to the supplement so the next committee would not reuse the old as-built alone.